Joe Redington Jr/Sr. High SchoolKnik, AK
The 65 million dollar, 94,450 square foot, fast track construction project will house over 500 students when completed in August 2015. The concrete scope of work, included over 3200 cubic yards of concrete, 182 tons of reinforcing steel and over 100,000 square feet of flatwork. DCI worked with the general contractor to sequence and schedule man power in order to meet the aggressive project milestones. DCI also designed custom grade beam block outs in order to allow the structural steel to be installed prior to the placement of the concrete slabs. Scope of Work: Concrete General Contractor: Collins Construction |
Furie - Kitchen Lights Development Onshore Facilities
Nikiski, Alaska
Fast Track construction of a Central Processing Facility. The facility consisted of 7 buildings, including (2) reciprocating compressor unit foundations. DCI installed over 1850 cubic yards of concrete and 103 tons of reinforcing steel in a little over 60 days. DCI worked directly with the General Contractor and Design team to overcome design challenges in the field and on the fly. Scope of Work: Concrete General Contractor: Conam Construction |
Fairbanks Walgreens Store #16024 & Autozone #6109
Fairbanks, AK
DCI was tasked with fast tracking the masonry scope of work at both the (Old Airport Road) Walgreens and the Autozone projects during the same month. DCI was able to achieve the schedule milestones and installed over 27,000 masonry units in less than a month. Scope of Work: Masonry General Contractor: Frontier Building Corp |
Fairbanks Walgreens Store #15944
Fairbanks, AK
16,390 SF New retail facility, DCI installed over 18,000 architectural split face block. DCI utilized both high lift grouting and use of Crank Up Scaffolding to meet project schedule milestones. Scope of Work: Masonry General Contractor: Unit Company |
Southeast Radiation Oncology Center
Juneau, AK
This project consisted of a concrete and wood framed building to house a medical linear accelerator for radiation treatments for oncology patients in the Juneau community. The project scheduled was extremely aggressive and the entire project was completed in less than 6 months. Along with the typical structure concrete, DCI constructed a concrete vault to contain the linear accelerator with concrete walls 20 feet in height and 3 feet thick while maintaining very strict tolerances. Scope of Work: Concrete General Contractor: Denali General Contractors |
Cordova Center
|
Petro Star Refinery ULSD ProjectLocation: Valdez, AK
Expansion and construction of new facilities, consisting of over 6000 cubic yards of concrete foundations, supports, containment slabs and various structures including a hydrogen processing facility, compressor building, and a sulfur recovery unit. Scope of work: Concrete General Contractor: AES/ASRC |
Gerrish Library
Girdwood, AK
9000 Sq. Ft. Library and Community Center Scope of work: Concrete Foundations and Slabs, Masonry Decorative Stonework General Contractor: Pinnacle Construction |
|
Completed Projects List